___________________________________________________________________________________________________________________________
Ariane 5 is an active expendable European heavy-lift launch vehicle that is part of the Ariane rocket family. It is operated by European Space Agency (ESA). Ariane 5 is now being only operated in 1 variant: Ariane 5 ECA. The other 4 remaining variants of Ariane 5 that have been already retired are Ariane 5 G, G+, GS, ES. From 2008 to 2015 Ariane 5 ES was also used for launching 5 cargo missions to International Space Station carrying Automated Transfer Vehicle (ATV). The vehicle operates out of Ensemble de Lancement Ariane 3 (Ariane Launch Area 3) at Guiana Space Centre.
Some design features as well as flags and markings I’ve adopted from GameplayReviewUK on Youtube so go check him out.
I recommend turning on "Advanced tweakables" in KSP settings.
To download each variant of Ariane 5, go to the "Files" section.
Also Don’t forget to download the flags for Ariane 5 in the "Files" section.
Here are my other projects.
Ariane 5 G, G+, GS, ES, ECA
EPC H158, EPC H173
EPS L9.7, EPS L10, EPC-A
EAP P238, EAP P241
Ariane 5 ECA Umbilical Tower
Ariane 5 G
T-0:00:04 - Main Engine Ignition Sequence Start
T-0:00:00 - Main Engine Ignition
T+0:00:06 - Solid Rocket Boosters Ignition
T+0:00:06 - Lift Off
T+0:01:34 - Solid Rocket Boosters Jettison
T+0:02:16 - Fairing Deploy
T+0:03:26 - Main Engine Cut Off
T+0:03:30 - First Stage Separation
T+0:03:36 - Second Stage Engine Ignition
T+0:03:42 - Separation Motors Jettison
Ariane 5 G+
T-0:00:04 - Main Engine Ignition Sequence Start
T-0:00:00 - Main Engine Ignition
T+0:00:06 - Solid Rocket Boosters Ignition
T+0:00:06 - Lift Off
T+0:01:34 - Solid Rocket Boosters Jettison
T+0:02:16 - Fairing Deploy
T+0:03:26 - Main Engine Cut Off
T+0:03:30 - First Stage Separation
T+0:03:36 - Second Stage Engine Ignition
T+0:03:42 - Separation Motors Jettison
Ariane 5 GS
T-0:00:04 - Main Engine Ignition Sequence Start
T-0:00:00 - Main Engine Ignition
T+0:00:06 - Solid Rocket Boosters Ignition
T+0:00:06 - Lift Off
T+0:01:44 - Solid Rocket Boosters Jettison
T+0:02:16 - Fairing Deploy
T+0:03:26 - Main Engine Cut Off
T+0:03:30 - First Stage Separation
T+0:03:36 - Second Stage Engine Ignition
T+0:03:42 - Separation Motors Jettison
Ariane 5 ES
T-0:00:04 - Main Engine Ignition Sequence Start
T-0:00:00 - Main Engine Ignition
T+0:00:06 - Solid Rocket Boosters Ignition
T+0:00:06 - Lift Off
T+0:01:44 - Solid Rocket Boosters Jettison
T+0:02:16 - Fairing Deploy
T+0:03:58 - Main Engine Cut Off
T+0:04:02 - First Stage Separation
T+0:04:08 - Second Stage Engine Ignition
T+0:04:14 - Separation Motors Jettison
Ariane 5 ECA
T-0:00:04 - Second Stage Cryogenic Arms Retraction
T-0:00:04 - Main Engine Ignition Sequence Start
T-0:00:00 - Main Engine Ignition
T+0:00:06 - Solid Rocket Boosters Ignition
T+0:00:06 - Lift Off
T+0:01:44 - Solid Rocket Boosters Jettison
T+0:02:16 - Fairing Deploy
T+0:03:58 - Main Engine Cut Off
T+0:04:02 - First Stage Separation
T+0:04:08 - Second Stage Engine Ignition
T+0:04:14 - Separation Motors Jettison
Calculated with full thrust.
About Project
Created: January 3rd 2024
Updated: January 3rd 2024
Project ID: 78777
License: All Rights Reserved
__________________________________________
Game Versions:
1.01.03
1.01.03
1.01.03
1.01.03
1.01.03
__________________________________________
Flavors:
WoW Retail
__________________________________________
Categories
Companions
Battle
__________________________________________
Main File
January 3rd 2024
__________________________________________
Recent File
January 3rd 2024
__________________________________________
Members
__________________________________________
Report